The sliding door is also called the sliding door. How to install the sliding door wardrobe?

[ Chinese wardrobe net ] Sliding door refers to the door that connects the pulley to the pulley and is movable on a fixed track, also known as the sliding door. It differs from a swing door that connects a door leaf with a hinge. The sliding door has the characteristics of easy installation, reusability, industrial production, small workshop production, fire prevention and environmental protection. So how to install the sliding door wardrobe ?

The first step of sliding door wardrobe installation:

Inspection tools impact drill, electric drill, blade, ruler, screwdriver (+ word, - word), hacksaw, rubber plug hole, glass glue gun, hex wrench, steel pliers, hammer, leather hammer, adjustable wrench, pencil .

Sliding door wardrobe installation second step: check products and accessories

1. Determine the installation location according to the order. If an order contains several doors at the same time, first ask the customer door hole, and the corresponding door hole will sort the door pieces.

2. Check the hardware and package number of the check list to match the package details. If there is any abnormal situation, immediately respond, such as whether the door is cracked, whether the glass or material is scratched.

3. Unpacking: First unpack all the outer frames and check if the material is scratched.

4. Description:

4.1 Spread the paper on the floor to prevent the material from scratching.

4.2 Upper rail, the two mullion and lower rails are connected by screws and the interface is flat and placed gently against the wall.

4.3 Handle the wall before installation:

1 Please ensure that the wall of the installation part is horizontal and vertical during construction. If there is any defect, first deal with it to avoid subsequent construction defects.

2 According to the size of the door opening, the width and height are reduced by 4mm.

4.4 The outer frame is moved into the door opening, and the installation should be balanced and stable.

4.5 After disassembling the door leaf package, check whether the glass is cracked, whether the material is scratched or not. Place it gently against the wall in order, and stack all the excess wrapping paper in the appropriate place.

Sliding door wardrobe installation step 3: installation of spare parts

1. Sliding door twin wheels, the adjusting machine wire is first removed, and the machine wire is adjusted horizontally under the door leaf to pass through the holes of the reinforcing iron and the mullion and the wheels are slightly tightened. The wheel springs are facing upwards and installed in the lower horizontal groove.

2. The upper wheel of the sliding door is installed, the U-shaped opening of the upper wheel is facing downward, and the 5*20 pan head wire of the upper frame of the mullion is tightened.

3. The hanging wheel is installed. Since the hanging wheel is installed in the upper rail slot when the outer frame is installed, the hanging iron piece is also mounted on the door leaf. When the door leaf is installed, the hanging wheel is inserted into the hanging wheel iron piece, and the small screw can be tightened. .

4. The hanging door is positioned and installed. After the door frame is installed, ensure that the two outer mullions are parallel and vertical. After the door leaf is installed, draw the line in the natural vertical overlap of the two doors to install the word position.

Sliding door wardrobe installation step 4: commissioning

1. Sliding door: Use &phi: 5mm hex wrench to adjust the lower wheel so that the door leaves are parallel and overlapping.

2. Hanging door: Remove the hanging wheel from the door leaf. Adjust the door leaf with a Phillips screwdriver to make the door leaf parallel and vertical.

3, set door, swing door:

3.1 Spread the wrapping paper on the floor to prevent the floor from scratching the material.

3.2 On the door cover, the two vertical frames are connected by screws at a 45-degree angle and the interface is flat. The telescopic iron screws in the middle of the front and back wire frame are loosened, and the front and back lines are placed gently against the wall.

3.3 Door fan package unpacking Check if the glass is cracked, whether the material is scratched or not, and gently place it against the wall in order, and all the excess wrapping paper is placed in the appropriate place.

4, small folding door two folds, the package will be opened, check whether the material has scratches, the folding door and the door hole vertical vertical, adjust the position, the door frame built-in screws fasten, let the door and door hole tight, then use The glass glue complements the seam of the door frame and the wall, and has better sealing and stability.

5, big folding door

5.1 Place the wrapper on the ground to prevent the floor from smearing the material.

5.2 The upper rail, the two mullion, and the lower rail are screwed out to ensure that the mouth is flat and gently placed against the wall.

5.3 The outer frame is moved into the door opening, and the installation should be balanced and stable.

5.4 Install the inner door first, then install the lock.

Finally, let's talk about the installation precautions for sliding door wardrobe.

1. Before the installation, you must prepare for the work and find the abnormality. The first time feedback can be used to make corrections in time.

2. Check the order status of the order ID and the site carefully to determine the installation sequence.

3. Pay attention to the protection of the product group accessories during the installation process.

4, the outer frame, the inner fan, the door line interface should be carefully checked, the interface is consistent.

5, pay attention to push and pull, hanging the door, the door fan has no collision frame, the inner fan scrapes each other.

6. When installing the outer frame, use the diagonal of the measuring ruler to check whether the diagonal is equal or not. If the outer frame has unevenness, it should be leveled to install the inner door.

7. If the customer asks a question during installation, please answer it in time and inform the correct solution.

8. If there is a problem with the installation, the installer must fill out the installation note and change the make-up order to do the tracking service.

9. After installation, it must be self-checked, adjusted, and then checked and confirmed by the customer.

10. The customer must have a clean environment after the completion of the installation service process.