How to install the integrated ceiling on the top

Three points of the integrated ceiling depend on the quality and seven points on the installation. The high-quality integrated ceiling requires a good installation to be considered a good ceiling. Do you know how to install the integrated ceiling on top ? There are many brands of integrated ceilings. It may be helpful to understand the installation method of integrated ceilings on the top , which is also very helpful for the installation of their own integrated ceilings.

1. Precautions before installation of integrated ceiling

Before installing the ceiling, make sure that there is no water leakage in the place where you want to install, to ensure the smoothness of the circuit and other infrastructure; predict the height of the room after installation is easy to install the corner line; check the strength of the place to be installed If the requirements are not met, reinforcement measures are required.

2. Tools required for the installation of the integrated ceiling

Tape measure, ink fountain, equilateral square triangle ruler, scissors, cutter, polisher, electric hammer, pistol drill, steel drill, wooden hammer, hammer, 8-inch wrench, impact drill, slotted / cross screwdriver, terminal block, Test pencil, saw bow, saw blade, etc.

3. The installation of six screws on the ceiling

1. According to the good size, Screw the expansion tube screw into the brick hole on the ceiling. Note that the height of the interlayer between the suspended ceiling and the roof is not less than 25cm

The screws must be perpendicular to the ceiling and fixed firmly, with the six screws kept parallel.

2. Take an average of six points on the ceiling and punch holes with an electric hammer (do not affect the installation of electrical appliances). Measure the distance from the top to the corner line, intercept the screw 8-10cm shorter than the actual distance, one of which is screwed on a nut and then the expansion screw (the screw is exposed about 3 mm), the other is screwed in the nut, and put The main keel hanger is screwed into a nut to fix it.

3. Knock the connection between the expansion screw and the screw into the hole, connect the large ceiling to the screw with a diameter of 6mm, screw the nut into the screw, and then sleeve into the large hanging piece, and then screw into the nut, etc. .

4. Installation of integrated ceiling keel on top

The installation of the keel is very important. After the keel is installed, the installation of the gusset and electrical appliances will be much smoother.

1. Compare the sizes of the major hangers, snap the main keel on the hanger, cut the required size, and pay attention to keeping the main keel parallel after snapping in.

2. Put the triangle hanger into the triangle keel and fix it on the main keel in turn. Before fixing the triangle keel, adjust the distance between each keel to 300mm. The air outlet duct of the range hood is arranged in front of the gusset plate, and it is not necessary if the range hood is not installed.

3. The specific method is: subtract 5mm from the installation length and intercept the required triangular keel. After the triangle hanging piece is inserted into the triangle keel, the triangle hanging piece is stuck on the main keel. Pay attention to the same triangle keel hanging piece on the main keel, the direction of the card should be opposite, so that it will not swing when the installation continues.

Fifth, the installation of integrated ceiling gusset

1. First, insert the connecting piece into the fixed triangular keel, cut the required length and insert the other end of the connecting piece, and insert the connection.

2. Install the gusset. First lift up the membrane on the four sides of the gusset, and install it in the same direction as the arrow on the membrane. The installation of the first row of buckle plates generally needs to be cut with a utility knife, pay attention to beauty and symmetry, and the cutting port is facing the wall.

3. Snap the cut buckle plate into the triangular keel, place the cut surface on the edge strip and pull out the corner of the edge strip to tighten the buckle plate. Take this as an example to install the first row of gusset plates.

4. Control the gap between the first row of buckle plates so that the spacing of the buckle plates is 0, the four corners form a "ten" shape, and the height of the buckle plate surface should be consistent. The installation quality of the first version of the gusset directly determines the installation quality of the back gusset.

6. Installation of integrated ceiling electrical appliances

1. Insert one side of the circlip into the round hole on the installation circlip of the box, insert the Machine Screw into the round hole on the electrical box and lock it. Put the box body with the circlip on the keel, press the opening grooves of the four circlips in line with the triangular keel and press down in turn to lock the electrical box firmly on the triangular keel.

2. Next, open the junction box, connect according to the corresponding label according to the corresponding function, then install the switch to test whether it is energized, and cover the junction box after energization.

3. Finally, check if the gusset plate is flat and the electrical appliances can be used normally. At this point, the installation of the integrated ceiling is basically completed.

Warm reminder: follow the information on this website and have more knowledge about integrated ceiling .

More exciting recommendations:

Precautions for ceiling in room with integrated ceiling

Tips for indoor ceiling decoration with integrated ceiling

Home improvement ceiling design

Advantages of integrated ceilings

What, the decoration still uses his own money? ! The Qi family is decorated in installments, with an ultra-low annual interest rate of 3.55% and a maximum loan of 1 million. Apply now to enjoy the discount

If you are interested in brand cooperation, content cooperation, and advertising of this website, please send an email to :.

Integrated ceiling integrated ceiling brand electrical range hood room home improvement interior decoration

2-tier fruit basket

Organization Rack is made of high quality 304 stainless steel, It is easier to clean without rust, safe, healthy and durable, Prevent rust or chemicals from contaminating food and damaging health. Suitable for putting fruits vegetables and bread in kitchen, dining and bar.

Humanization Design: The stainless steel Fruit Basket are designed with no borders and hidden solder joints, will not cut your hand, and does not hang fabric, more convenient cleaning. Start with the details and let the family eat more reassuring food.

304 Stainless steel basket,2-tier fruit basket,2 layer fruit basket,Stainless steel mesh basket,picnic basket

Shenzhen Lanejoy Technology Co.,LTD , https://www.szstainlesssteelwiremesh.com