Shanghai Haozhuang teaches you to install water bath and dry nitrogen blower

Shanghai Haozhuang Instrument Co., Ltd. develops the LNB brand nitrogen blower, which is energy-saving and environmentally friendly, leading the country. Professional manufacturing is more secure and affordable

Water bath installation (1) Place the water bath on a stable surface, such as a laboratory table or fume hood; (2) Turn off the water bath power switch; (3) Turn the water bath temperature control knob to the minimum; (4) Turn the water bath power on Plug it into a 220V / 50Hz three-wire grounded power socket. (5) Add water to the water bath. The water surface should not exceed 15mm from the edge of the water bath and not less than 10mm from the ring heater. Drying without water is strictly prohibited. It is recommended to use deionized water to reduce particulate blockage, prevent scale formation in the water bath, and extend the life of the water bath. (6) Connect the gas flowmeter to the gas pipe to the source of clean nitrogen (or air). The pressure of the gas source is not greater than 200kpa, if it is greater than 200kpa. Nitrogen blower installation (1) Take out the nitrogen blower, unscrew the hex nut at the bottom, remove the packaging positioning plate, and unscrew the chassis spring pad. Reverse the three bottom corners of the chassis and tighten. According to the order of hex nut, spring pad and chassis, install the three on the center rod in turn and tighten them. Place the nitrogen blower in a water bath or other flat surface. When the nitrogen blower is placed in a constant temperature water bath, the temperature sensor of the constant temperature water bath (vertical upward) should be located inside the temperature sensor hole (large hole) of the chassis. (2) Connect the gas pipe to the gas flow meter outlet. (3) Loosen the butterfly knob, raise the nitrogen blower to the highest position, and then tighten the butterfly knob. (4) Adjust the height of the sample positioning frame according to the length of the test tube. A. When the length of the test tube is between 25-100mm, use a hexagon wrench to loosen the positioning screw on the center ring of the tray, lift the tray to the appropriate height, and pay attention to the gap between the tray and the position of the test tube, and then tighten the positioning screw. When the length of the test tube is less than 25mm, the tray can be turned upside down so that the center ring of the tray is under the tray, and then adjusted. When adjusting the tray, if it needs to be reversed (that is, the center ring of the tray is down), loosen the butterfly knob, remove the center sleeve, loosen the top wire of the center ring of the tray, remove the reverse along the sleeve, and remove it if necessary Positioning slip ring at the bottom end of the casing or the upper end of the spring. B. If the length of the test tube is greater than 100mm, the gas distribution plate can be adjusted to the second position of the central casing, that is, the top plate moves upward by about 35mm. That is, loosen the positioning screw, slide the gas distribution plate to the upper hole, and then tighten the positioning screw. C. Adjust the sample positioning frame (this step needs to be adjusted frequently): first loosen the positioning screw on the center ring of the positioning frame, raise the sample positioning frame to the desired height, and fix it with the positioning screw. (5) Needle: Nitrogen blower comes standard with a 4 inch 19-gauge stainless steel flat-head needle. Align the stainless steel needle to the bottom of the needle valve tube and tighten. Take care not to install it too tightly. Use hand strength. (6) Raise the needle valve tube to the highest position: tighten the lock nut on the gas distribution plate, and the needle valve tube can be easily slid up and down by hand. (7) Turn the needle valve on the needle valve tube clockwise to close it. (8) Close the flowmeter valve clockwise.

Shanghai Haozhuang Instrument Co., Ltd. is a technologically innovative high-tech enterprise based in Shanghai and radiating the whole country. The company has first-class technical personnel and a good team of technicians, with advanced technology and strong development strength. Since the establishment of the company, the products and The service is recognized by customers and has a good reputation. The company adheres to the business philosophy of "integrity. Professionalism. Innovation. Growth" to provide customers with elaborate services. The company's main business and production scope include: testing equipment, laboratory equipment, cleaning equipment, Environmental protection equipment and undertake the design and customization of non-standard products and provide related technical services.

blow mould fillet table

Fish Fillet Table,Fish Cleaning Table,Folding Fillet Table,Plastic Fish Cleaning Table

Zhejiang Lifan Furniture.Co.,Ltd , https://www.lffoldingtable.com